Placing Prefabricated Structures With Precision
Russell Crane Service provides modular building placement and installation support for schools, offices, and industrial facilities in Yakima, Washington.
When your organization in Yakima needs additional classroom space, temporary office facilities, or permanent modular structures, the prefabricated units must be transported to your site and lifted into position on prepared foundations with enough accuracy to ensure proper alignment of doors, windows, and utility connections. Modular buildings arrive on flatbed trailers as single or multi-section units, and placing them requires crane equipment capable of lifting structures that may weigh 20,000 pounds or more. Russell Crane Service handles the placement of modular buildings and prefabricated structures across Yakima, using coordinated crane lifts that ensure proper alignment and reduce project timelines.
The placement process begins with site coordination to confirm foundation readiness, crane access, and delivery scheduling. The modular unit is rigged using lifting straps attached to engineered lift points built into the structure, then raised from the trailer and maneuvered into position over the foundation piers or slab. The crane operator works with your contractor to guide the unit into place, ensuring that connection points for plumbing, electrical service, and HVAC systems align correctly. This service supports public and private projects including school expansions, workforce housing, medical clinics, and industrial control rooms.
If your Yakima project involves modular construction or temporary facility installation, request modular building placement to confirm crane availability and coordinate with your site schedule.
Coordinated Crane Lifts for Multi-Section Structures
Modular building placement in Yakima involves positioning the crane near the foundation site with enough reach to lift the structure from the delivery trailer and place it onto piers, beams, or a concrete slab. The crane operator confirms that the foundation is level, that anchor bolts or connection plates are in place, and that the delivery truck is positioned for safe unloading. Outriggers are deployed to stabilize the crane, and the modular unit is lifted slowly to avoid stress on the frame and exterior panels.
Once the modular building is placed, you will notice that the structure rests evenly on the foundation, with seams between sections aligned for joining and utility penetrations positioned correctly for hookup. The efficient installation process reduces the time required for site work and allows your contractor to proceed immediately with sealing, finishing, and final connections.
Russell Crane Service has worked on projects involving single-wide and double-wide modular units, multi-story classroom buildings, and custom prefabricated structures designed for specific site conditions. The service does not include foundation preparation, utility connections, or interior finishing, which must be arranged separately with licensed contractors. This work is available for public and private projects throughout the service area.
Most project managers have similar concerns before scheduling
General contractors and facility planners often want to know about site access, timing, and how the crane lift integrates with foundation work and utility installation, and these questions help ensure the modular unit arrives and is placed without delays or complications.
Russell Crane Service has supported school districts, government agencies, and private developers across Yakima with modular building placements for temporary classrooms, office expansions, and permanent facility installations. If you are planning a modular construction project or need to relocate existing structures, learn more about placement options and schedule a site assessment to confirm crane access and foundation readiness.




